13:45 duration 13 minutes 45 seconds
MECH 5174/6074: 10-07_Bayes_Rule
From Christopher Wicker
26:36 duration 26 minutes 36 seconds
MECH 5174/6074: 10-05_Sampling_Plans
16:37 duration 16 minutes 37 seconds
MECH 5174/6074: 01-02 Evolution of Quality Control
06:01 duration 6 minutes 1 second
MECH 5174/6074: 09-07 Process Capability Analysis
08:59 duration 8 minutes 59 seconds
MECH 5174/6074: 09-02 Specification Limits
14:10 duration 14 minutes 10 seconds
MECH 5174/6074: 09-04 Natural Tolerance Limits
15:00 duration 15 minutes 0 seconds
MECH 5174/6074: 07-06 Charts for Individual Units
25:57 duration 25 minutes 57 seconds
MECH 5174/6074: 07-05 Mean and Standard Deviation…
MECH 5174/6074: 07-05 Mean and Standard Deviation Charts
20:37 duration 20 minutes 37 seconds
MECH 5174/6074: 07-04 Mean and Range Charts
09:13 duration 9 minutes 13 seconds
MECH 5174/6074: 06-04 Rational Samples
17:19 duration 17 minutes 19 seconds
MECH 5174/6074: 06-03 Average Run Length
19:55 duration 19 minutes 55 seconds
MECH 5174/6074: 06-02 Operating Characteristic…
MECH 5174/6074: 06-02 Operating Characteristic Curve
09:51 duration 9 minutes 51 seconds
MECH 5174/6074: 06-02 Causes of Variation
16:03 duration 16 minutes 3 seconds
MECH 5174/6074: 05-02 Histograms
16:21 duration 16 minutes 21 seconds
MECH 5174/6074: 05-02 Box Plot